Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line

Product Details
After-sales Service: 1 Years
Warranty: 1 Years
Type: Pipe Extruder
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (23)
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
  • Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Find Similar Products
  • Overview
  • Product Description
  • Certifications
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
JMG75/33
Plastic Processed
PVC
Product Type
Plastic Pipe Extruder
Feeding Mode
One Feed
Assembly Structure
Integral Type Extruder
Screw
Single-Screw
Automation
Automatic
Computerized
Computerized
Maximum Tape Disk Diameter
φ1350mm
Width of Tape Disk
30-200mm
Thickness of Reinforcing Tape
0.3-1mm
Maximum Tape Disk Mass
450kg
Winding Angle
40°-70
Angle Control Precision
±0.01°
Tape Disk Angle Control
Independent Control
Pipe Diameter Range
Inner Diameter φ75mm-φ200mm
Maximum Speed
25rpm
Main Rotating Motor
20kw
Control Panel
Siemens Computer Touch Screen
Specification
2-3T
Trademark
JMG machinery
Origin
Suzhou China
Production Capacity
550kg/H

Product Description

Product Description

Equipment Purpose:

is mainly used for high-speed extrusion of HDPE, PP, PVC and other olefin pipes.

Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
 

Pipeline applications:

The pipeline is mainly used in the field of water and gas transmission.

Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line

RTP pipe production equipment with winding

Steel tape winding RTP pipe production line
Each unit comes with two sets of holders mounted at each end of the spindle.
Each unit is equipped with a heating module to heat the surface of the pipe and the strip respectively, and the temperature is automatically controlled.
Servo control for displacement adjustment, angle adjustment, torque adjustment, and revolution (13 units/group)
High-precision U.S. imported electric cylinders are used for both angle and displacement (8pcs/group)

RTP Pipe Winding Equipment
Number Equipment quantities
1 Four-tape disk strip wrap-around tape 4units
2 Independent heating box 2units
3 Cooling air ring 4units
4 limit holder 1unit
5 JMG-SF5.5m winding and unwinding machine 1unit
6 PLC programmable computer control system 1set

 

Certifications

 

Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
 
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
 
Company Profile

Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production LinePlastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
Plastic PVC|HDPE|PE|PP|PPR Pipe Extrusion Making Production Line
FAQ
 

Common problem:
Question 1: What are your strengths?
    Answer: Kunshan Gemag Machinery adopts a unique combination of infrared and hot air heating. The heating method is reasonable, efficient, with good heating effect and stable performance, which makes the adhesion of the reinforcement layer stronger. With mature technology and experienced engineers.
Question 1: How will the machine be assembled and debugged when it arrives at the factory, and will the customer's employees be trained?
    Answer: We will debug the equipment before delivering it to the customer's site. After the debugging is correct, it will be disassembled and sent to the customer's factory. After shipment, we will have experienced engineers on-site to install and assist in debugging. After the on-site installation and commissioning are completed, all-round training will be provided to the customer's employees.
Question 1: What do you do if there is a problem or failure with equipment that requires guidance or replacement parts?
    Answer: If there is a problem, we will provide video technical guidance, and if necessary, we will send engineers to the site to solve the problem. If during the warranty period, parts need to be replaced, we will send spare parts for free. For wearing parts, we only charge the cost fee.
Question 1: How long is the warranty period of the product?
    Answer: We will provide 1 year parts warranty and technical support.
Question 1: Can I visit your factory in China?
    Answer: Yes, our factory is located in Kunshan, Suzhou, near Shanghai. If customers need on-site visits, we can provide airport pick-up for you. Question 1: Can you customize according to requirements?
Answer: Kunshan Gemag Machinery is committed to differentiated and exclusive customization according to the different needs of customers. Our goal is to pursue efficiency and performance stability. We design machines according to customers' products to meet customers' needs.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
People who viewed this also viewed